WELLNESS AREA

Project carried out for the Pool Hall, Fira Barcelona, ​​which brings together the main brands and companies in the pool and spa sector, showing the most advanced technological solutions and services related to the pool, wellness and fitness sector. Award-winning stand.

Blok was in charge of coordinating the entire assembly with the different suppliers of pool equipment. The main complexity of the project was the assembly and installation of the saunas and a real pool in just 3 weeks in a space for fairs.

Blok was also in charge of preparing the technical plans, RFQs, dealing with suppliers, complete production of this 621m2 space, which housed a reception, meeting rooms, a fitness room, a spa area, cabins, changing rooms, saunas, a Jacuzzi and a real ready to use fully operational pool which was installed using construction works.

  • Client
    Piscina Fair/Congress 2019. Fira Barcelona.
  • Deliverables
    Blok: as Design and Production.
    Design, technical drawings, RFQs, dealing with providers, full production and project managing.